top of page

Adirondack Medical Center Surgical Addition and Renovation | Saranac Lake, NY | LBA

Lavallee Brensinger Architects designed the new construction and renovation which replaced four existing operating rooms, pre and post-operative care areas, and the existing central sterile processing at the existing Adirondack Medical Center. The new Perioperative spaces consists of six operating rooms (including a Hybrid OR), three procedure rooms, 21 Pre/Post-Op rooms, ten PACU bays, and clinical support spaces. The project also includes a new MRI Suite.

My role on the project started during Design Development as a project technician generating room criteria sheets and supporting the development and coordination of construction documents

bottom of page