top of page
Kim McCarthy, RA, LEED AP
DESIGN PORTFOLIO & BLOG
Adirondack Medical Center Surgical Addition and Renovation | Saranac Lake, NY | LBA
Saranac Lake Surical Suite Entrance
Saranac Lake MRI (TS)
Saranac Aerial Final 2-29-16
Saranac Lake Surical Suite Entrance
1/6
Lavallee Brensinger Architects designed the new construction and renovation which replaced four existing operating rooms, pre and post-operative care areas, and the existing central sterile processing at the existing Adirondack Medical Center. The new Perioperative spaces consists of six operating rooms (including a Hybrid OR), three procedure rooms, 21 Pre/Post-Op rooms, ten PACU bays, and clinical support spaces. The project also includes a new MRI Suite.
My role on the project started during Design Development as a project technician generating room criteria sheets and supporting the development and coordination of construction documents
bottom of page